) were operated for 525 days to define the best design and operational conditions to maximize the removal...213 g cod m3 d1 and 119 g bod m3 d1 at the lowest hrt (0.5 d). ammonia and total nitrogen maximum removal
phosphorus using membrane bioreactor) ;ep2253596(欧盟)17、一种不排泥除磷膜生反应器工艺(method for removing phosphorus...jet aeration apparatus and method of using the same); us8192625b2(美国)16、一种不排泥除磷膜生物反应器工艺(method for removing